Eryk mechanics and electricians have provided technical works for concrete production facilities.

Scope of works:

  • Mechanical assembly and electrical installation of conveyor systems.
  • Installing new SKAKO system in new concrete mixing facilities and/or replacing an old concrete mixing facility with a new SKAKO system (depending on a project facility)
  • Laying and routing power and control cables according to the approved design.
  • Installing switchgears, and main distribution panels.
  • Connect motors and machinery to the power supply and control panels.
  • Preparation of the site for the installations.
  • Cladding of the buildup concrete factory with sandwich panels.
  • Joint sealing and waterproofing, and their verification.

Quote:

“We were obviously under pressure the entire time. There is no doubt that if Eryk had not sent their skilled and competent people, we would not have succeeded. They understood the task and the time schedule. They are skilled and hard-working employees. We have been very satisfied with cooperating with Eryk on the projects we have carried out together, and we will certainly continue using Eryk as a subcontractor when the need occurs.” Carl-Christian Jull Jensen, Head of Project and Installation Department, SKAKO.

About the company:

SKAKO is a Danish company producing turnkey concrete mixing systems, 95% of which is sold to export markets throughout the world.

Eryk has carried out electrical installation at conveyor deliverables at SKAKO’s sub supplier in Poland. Among the tasks done were installations for conveyors to be shipped to facilities in Australia.

The main part of the cooperation consists of onsite installation where Eryk is mainly carrying out mechanical installations of concrete mixing systems.

“It is especially worth mentioning a project in the summer of 2012 in Sweden, when BIC Electric assisted us in the best possible way. The customer needed to replace an old mixing facility with a new SKAKO system. The challenge was the fact that we only had the 4 weeks when the factory was closed for the summer to take down the old system, install the new one and put it into operation”, says Carl-Christian Juul Jensen, Head of Project and Installation dept.

“The project became a regular success story – after 4 weeks we were ready; everything ran smoothly. In short: a great success.”