INDUSTRY & AUTOMATION

Installation support for tunnel construction site

Customer

MCT Italy

Project locations

Eryk team provided electrical and mechanical installation support for material-handling systems at the Saint-Martin-de-la-Porte CO7 construction site, part of the TELT Lyon–Turin cross-border infrastructure project. We had a total number of  54 technicians on the project.

     

Scope of work

Mechanical tasks include:

  • Construction of steel support towers
  • Assembly and installation of silos and supporting structures
  • Installation and alignment of belt conveyors between the silos and the concrete factory
  • Ensuring mechanical integration and alignment between all conveyor sections
  • Installation/replacement of cement silo components
  • Completion of hoist and bus-bar mechanical setup

Electrical tasks include:

  • Connection of cables to the relevant devices and control cabinets
  • Installation of cable trays along the entire route of the new conveyor belts
  • Connection of aggregate box hoist – pull cables, terminating connections and performing operational testing
  • Bus-bar system final testing and startup
  • Wiring of new safety accessories
  • Post-installation testing